Logistics Magazine - Features Article
M3, A34 and A33 closures
National Highways is carrying out essential works that will affect the M3, A34 and A33 as part of an improvements programme.
M3 – full weekend closures
To enable the safe installation of steel beams for the new M3 roundabout bridge decks, the M3 will be fully closed in both directions between junctions 8 and 9 on the following weekends:
9pm Friday 30 January to 6am Monday 2 February 2026
9pm Friday 13 February to 6am Monday 16 February 2026
Local diversion routes can be found here: M3 junction 9 to 8 northbound and southbound diversion.
Strategic diversion for freight, large vehicles and coastal flows
Operators of HGVs, large vehicles and freight travelling to or from the coast are strongly advised to use the designated strategic diversion via the A3. This route is designed to avoid congestion on local roads and reduce delays for long‑distance and commercial traffic.
A34 and A33 – 24-hour southbound closure
Following November’s successful removal of the northern beam at Kings Worthy Bridge, the replacement beam will now be installed. Due to the size and reach of the crane required, a full southbound closure is necessary on:
9pm Saturday 7 February to 9pm Sunday 8 February 2026
A34 southbound from Three Maids Hill
A33 southbound from the Cart and Horses junction
A signed diversion route will be in place via the A34, A303 and M3: A34/A33 southbound diversions.
More Logistics Magazine - Features Article Articles
Related Pages
Check out more news and media
Discover More
Stay Ahead. Stay Compliant. Stay Connected.
Join thousands of logistics professionals using Logistics UK to navigate industry change with confidence.
Join Us